This is our filming schedule
DATES | ACTIVITY | PEOPLE INVOLVED | LOCATION | EQUIPMENT | STATUS |
09/11/24 | - Recording the convenience store bits of ata enjoying his beverage and his drink
| Ata Nathan | Big M Batanghari CK Puputan/Renon (alt.)
| - Camera
- 30mm Sony OSS F 1.8
- Mode of transport
| Completed |
09/11/24 | - Recording shots of ata on the road, (not rolling shots, still shots)
| Ata Nathan
| Kuta Underpass (Dewa Ruci) Ngurah Rai Underpass (alt.) | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
| Completed |
09/11/24 | - Shoot the introduction scenes that are going to be used in the beginning of the music video.
- Record the performance scene where ata sings the entire song from start to finish, as backup footage whenever we don’t know what to put
| Ata Nathan
| Sanur Beach Mertasari Beach (alt.) | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
| Completed |
18/01/25 | - Recording stock shoots video (on Ngurah Rai Airport underpass)
| Ata Nathan | Ngurah Rai underpass | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
| Completed |
23/01/25 | - Recording music video scenes in Living World
| Nathan Ata Louis Haresha | Living World Teras Ayung (neighborhood) | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
- Musical Instruments (guitar, bass)
| Completed |
07/03/25 | - Recording stock shoots for music video scenes while also reshooting some scenes in the MV to improve the result (as what our teacher advised to)
| Nathan Ata Louis Haresha | Living World Teras Ayung (neighborhood) | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
- Musical Instruments (guitars, bass)
- Lighting
| Canceled |
10/03/25 | - Recording stock shoots for music video scenes
- while also reshooting some scenes in the MV, such as the performance scene, to improve the result (as what our teacher advised to)
| Nathan Ata Louis Haresha | Living World Teras Ayung (neighborhood) | - Tripod
- Camera
- 30mm Sony OSS F 1.8
- Mode of transport
- Musical Instruments (guitars, bass)
- Lighting
| Complete
|
Reflection: Using the filming schedule, we were able to manage our time relatively well and got to record for our music video before it was due and even with spare time to rerecord a few scenes however we did find it hard to get the motivation to stick to the scheduling as school occasionally gives us homework on these days, meaning that as soon as we get home we have work to get to no matter how tired we are, especially for me who was editing footage by the end of every recording session I was heavily demotivated.
No comments:
Post a Comment